Kitchen renovations across Vancouver · Downtown Vancouver · North Vancouver · West Vancouver · East Vancouver · South Vancouver · Kitsilano · Yaletown · Mount Pleasant Rated 5.0 out of 5 from 28 Google reviews. Open 24 hours, 7 days a week (778) 655-4056
Kitchen Renovation · Burnaby

Kitchen Renovation in Burnaby, BC

Burnaby splits down the middle: half our projects here are strata jobs in towers, half are post-war houses with a load-bearing wall in the way.

  • Tower work: strata package, freight lift, riser-aware layout
  • House work: framing inspected, panel checked, suite kitchen quoted separately
  • City of Burnaby permits filed during design, not after demolition
  • Same rates as Vancouver — no travel charge
28 Google reviews 16 years in Metro Vancouver 2-year workmanship warranty
Compact grey handleless kitchen with an oak accent panel, a built-in oven and microwave column and dark worktops

Get Your Free Burnaby Kitchen Renovation Quote

Tell us about the kitchen and we will come back with a real number - not a range designed to get us in the door.

Free, no-obligation estimate. We respond 24/7.

Rather talk it through? Call (778) 655-4056

Burnaby’s town centres — Metrotown, Brentwood, Lougheed, Edmonds — are dense high-rise, much of it post-2005. The established neighbourhoods — Burnaby Heights, Capitol Hill, Deer Lake, Buckingham — are post-war houses on larger lots, a good share with a basement suite.

The two are different jobs with different risks, and they get quoted differently. A tower kitchen’s uncertainty is the strata calendar. A house kitchen’s uncertainty is what is behind the wall and in the panel.

Tower kitchens: Metrotown, Brentwood, Lougheed

Burnaby’s newer towers follow the same process as downtown Vancouver: a strata alteration agreement taking two to six weeks, contractor liability insurance naming the strata, WorkSafeBC clearance, a booked freight lift and weekday work hours.

Kitchen footprints run 85 to 130 sq ft and are usually open to the living space. The specification priorities: full-height cabinetry to recover storage, deep drawers throughout, a counter-depth or integrated fridge so the walkway stays clear, and a dishwasher quiet enough to run while people are in the room.

Typical cost $26,000 to $45,000, four to six weeks on site. See condo kitchen renovations.

House kitchens: the Heights, Capitol Hill, Deer Lake

Burnaby’s post-war houses are 1950s to 1970s bungalows, split-levels and Special variants. Two items recur: a 100-amp panel that is marginal for a modern kitchen, and a load-bearing wall between the kitchen and the living space.

The panel question is often complicated here by a basement suite drawing from the same service. Two kitchens, two ranges and two sets of appliances on 100 amps is not workable, and the upgrade is $2,500 to $6,000.

Capitol Hill and parts of the Heights are on slopes, which affects delivery access and sometimes means the kitchen is half a level from the entry. We survey the route at the site visit.

A representative Burnaby house project

The pattern: a 1972 house in Burnaby Heights, 140 sq ft kitchen at the rear, closed off from the living room, original cabinetry, a 100-amp panel shared with a basement suite, and a lane at the back that makes access easy.

What typically gets specified: the partition to the living room opened up — sometimes non-structural in this stock, sometimes not, established by inspecting the framing — a panel upgrade to 200 amps, semi-custom cabinetry with deep drawers, quartz counters, a tiled backsplash, and LVP flooring running through to the adjoining space.

Typical cost $48,000 to $72,000 including the panel and the opening. Six to eight weeks on site. The suite kitchen, if it is in scope, is quoted separately at $12,000 to $25,000 and scheduled afterwards so the house always has one working kitchen.

Where the risk sits in each

A tower renovation’s risk is almost entirely calendar: the strata council meets when it meets, and nothing starts before it approves. A house renovation’s risk is physical: what is in the panel and what is behind the wall, neither of which is fully knowable until demolition.

We handle those differently in the quote. For a tower we lock the price and treat the approval date as the variable, submitting the application as early as the scope allows so it runs alongside cabinetry manufacturing.

For a house we open an inspection hole, check the panel, and name the likely items as allowances — panel upgrade, subfloor levelling, wall framing — so the number you approve already accounts for them rather than absorbing them as change orders later. That is also why we recommend holding 10 to 15% contingency on a house and rather less on a tower.

How the two compare

Burnaby's two project types side by side
Metrotown / Brentwood towerHeights / Capitol Hill house
Typical kitchen size85 – 130 sq ft130 – 180 sq ft
Full renovation cost$26,000 – $45,000$38,000 – $72,000
Main uncertaintyStrata approval timelinePanel capacity and framing
Approval neededStrata alteration, 2 – 6 weeksBuilding permit only if structural
Layout flexibilityVery limited — riser is fixedGood — basement or crawlspace beneath
Time on site4 – 6 weeks5 – 8 weeks
Reviews

Rated 5.0 by Metro Vancouver homeowners

5.0 28 Google reviews · See them on Google
★★★★★
I got a kitchen renovation with Vancouver Kitchen renovations Co and it was fantastic. The quality and customer service was top notch. Would reccomend them for any future kitchen renovations for my friends and family!
C. 3 months ago Google
★★★★★
kel did a great job redoing my kitchen floor and cabinents. he came in quick after i had an emergency flood. looks fantastic
Carolina 1 month ago Google

Kitchen Renovation in Burnaby: common questions

How much is a kitchen renovation in Burnaby?

$26,000 to $45,000 for a Metrotown or Brentwood condo kitchen, and $38,000 to $72,000 for a post-war house.

A basement suite kitchen is quoted separately at $12,000 to $25,000, and we schedule it after the main kitchen so the house always has one that works.

Do you charge extra to come to Burnaby?

No. Rates are identical to Vancouver and travel within the service area is not billed separately.

Burnaby is one of the areas we work in most, split roughly evenly between towers and houses.

Do Burnaby condos need strata approval?

Yes, in essentially every building. Alteration agreement, contractor liability insurance naming the strata, WorkSafeBC clearance letter and a work schedule.

Two to six weeks depending on when the council meets. We prepare and submit the whole package.

Will my Burnaby Heights house need an electrical upgrade?

Often, and more so if there is a basement suite on the same panel. Two kitchens and two ranges on 100-amp service is not workable.

$2,500 to $6,000 to upgrade to 200 amps, and far cheaper while the kitchen walls are already open.

Can the wall between my kitchen and living room come out?

Usually, and whether it is load-bearing decides the cost — $1,500 to $4,000 if not, $8,000 to $25,000 if it is.

In 1970s Burnaby stock it varies. We open an inspection hole and look at the framing before quoting rather than guessing.

How long do City of Burnaby permits take?

Four to ten weeks for residential alteration permits, comparable to Vancouver.

We file during the design phase so it runs in parallel with cabinetry manufacturing rather than after it. A like-for-like renovation needs no building permit at all.

Get Your Free Burnaby Kitchen Renovation Quote

Free, no-obligation estimate. We respond 24/7.

Free, no-obligation estimate. We respond 24/7.

Rather talk it through? Call (778) 655-4056

Ready to Talk About Your Kitchen?

Send the details through and we will get back to you within one business hour with next steps - or call and speak to someone who actually builds kitchens.

Call Now Get Free Quote